Brief: To refurbish and decorate a timber shopfront;
The timber on this classic high street shop frontage was in a bad state of repair, and with limited time to complete the works before opening day was a tall order. In the end ‘wet paint’ signs were required as the work was completed with just a few hours before the ribbon was cut. I am please to say the grand opening was a great success and no one got paint on their cloths, phew!
Works carried Out:
Sand down existing paintwork to the shopfront and remove original signage.
Make repairs to rotten timberwork .
Fix marine ply to head, and seal all joints.
Apply two coats of grey Dulux weathershield undercoat.
Apply two coats of Black high gloss weathershield topcoat.